Fuselage Skins-Drilled
February 20, 2020
February 20, 2020
February 17, 2020
The bottom skins of the fuselage are being clecoed into place.
Will fit the wingtip and roll the leading edge next time out then onto the last piece of the empennage-the left elevator.
February 16, 2020
Three different layers so using three different size rivets.
February 15, 2020
The elevator is bent and more ribs have been added
Good progress on both the fuselage and right elevator.
February 14, 2020
Worked on a couple of longerons
The last two shots show the perspective of the right aileron spar.
February 13, 2020
This is the inside of the right elevator with stiffeners back riveted.
Got all the stiffeners in place and riveted. Also have the ribs drilled and clecoed.
February 12, 2020
… and on the other side of the shop I am working through the elevators.
This shows the luggage area in place.
Bulkheads
February 8, 2020
February 7, 2020
Center Section
January 26, 2022 9 hours
Will spend the day shaping stiffeners for the right rudder.
January 23, 2020 8hrs
Need to do some back riveting on the spar.
January 24, 2020 7.5 hrs
The forward side of the rudder has been rolled and riveted. Also the aft edge has been back riveted.
Top fairing is attached. Still need to fit bottom fairing.
January 25, 2020 8hrs
Ready to put the rudder on the shelf and start on the elevators. The bottom fairing is fitted but will not be attached for wiring later.
January 22, 2020 8hrs
Trailing edge needs finished.
January 23, 2020 8hrs
Hope to finish rivet today. Tailing edge looks a little tedious.
January 21, 2020
That’s it for today. Doesn’t seem like much but it is a full days work for me. Tomorrow the rudder skins go on. Should look like a rudder then.
January 13, 2020
Per Kim at Van’s:Deposit has been received for engine and prop. Van’s waiting for expected delivery.
Also ordered parts R912 and R913.
Stein Air will be doing the panel. The panel will be painted the same color(red)as the accent on the fuselage with white lettering. We are on revision 6 for the panel.
January 10, 2022
It won’t be long before I start riveting on the spar.
January 11, 2020
Rudder has more to it than I ever imagined. Most of the riveting complete and then the skins I worked on earlier in the week will go on. Long days!
January 12, 2022
No pics today. Completed the riveting of the bottom of the rudder. Unfortunately I machine counter sunk the counter balance rib instead of dimple countersinking so I will have to wait on a new part.
January 8, 2020
Back riveting the stiffeners. After dimpling and deburring, place the rivets on the exterior side of the skin, put tape over the rivets to hold them in place, place stiffener over rivets, make sure plate is placed properly, and rivet stiffener to interior skin.
January 9, 2020
Riveting the stiffeners to the rudder skins is complete.
Jan 7, 2020
Flavor of the Day - Rudder - Left and right inside surfaces.
Nov 24, 2019
Completing the VS includes both bucking rivets and squeezing the rivets on the perimeter.
Nov 24, 2019
Inside the VS.
Nov 22, 2019